Burabay milk
Dairy plant with a capacity of 30 tons per shift”, located at: Republic of Kazakhstan, Akmola region, Burabay district, Shchuchinsk, Astana-Petropavlovsk, uch.1A
Six companies of the group cover design, supervision, construction and material production within a single chain of responsibility.
Dairy plant with a capacity of 30 tons per shift”, located at: Republic of Kazakhstan, Akmola region, Burabay district, Shchuchinsk, Astana-Petropavlovsk, uch.1A
Construction of the Karaganda complex Alloys plant with a capacity of 175,000 tons per year, with the prospect of increasing capacity to 600,000 tons per year (1st stage, 1st start-up complex “Correction”) in Karaganda.
"Construction of vaporizer pond No. 1 for Vostochnaya Sary-Oba mines", "Zapadnaya Sary-Oba" and "Itauyz"; "Construction of the Zhaysan River evaporation pond"; "Construction of a…
Technical inspection of the roof structures of the Facility “Building of the medical and wellness complex “Alatau”, located at the address: Almaty, Nauryzbay district, md. Shugila, md. Tausamaly, 50A”
Technical inspection of the historical and cultural monument “Dostyk Hotel”,Almaty
Technical inspection of the International School, Astana